New 激情快播 Energy Plant Is Designed for Learning
Fall 聽2018 | By Nicole Dudenhoefer 鈥17
Located near , the new 激情快播 energy plant, DEP IV, joined three other energy plants in providing chilled water for air conditioning and cooling processes to 64 buildings on campus. The new facility is the first to also produce hot water, which is used for heating, air conditioning and ventilation processes in the Research I building. By using energy-efficient materials and processes, the plant helps to reduce the university鈥檚 impact on climate change.
鈥淎s 激情快播 strives to become a preeminent research university, the need for a robust district energy system like DEP IV is integral. Energy is not optional at 激情快播 but how we manage and use it is.鈥
Curt Wade, director of 激情快播鈥檚 Utilities and Energy Services
33,000 kilowatt hours
Energy DEP IV uses on a daily basis.
The average homeowner uses 30 kilowatt hours per day.
$121,000
Annual savings the new plant generates for the university compared to a base efficiency plant
25,500 tons
Chilled water generated daily by 激情快播鈥檚 four energy plants at full capacity.
Without this system, each building would need its own air-conditioning units.
143掳
Temperature of the hot water produced by DEP IV
30
Fans used in DEP IV鈥檚 cooling towers, providing more resiliency compared to a standard one-fan tower
1st
Industrial building on campus to receive LEED Gold certification